MINIATURE CRANE HANDLING
Place the support. Build the next tier.
Move the trolley, raise the cable and let the cargo settle. Stack contracts ask you to carry above placed loads and release at the right height.
Learn the controls
The lower load comes first.
Twelve authored stack jobs add actual support order and elevated target centers to 120 floor-delivery contracts. A missing foundation cannot receive an upper load.
Come back to the suspended load.
The trolley, cargo swing, cable height and placed tiers are saved locally. An unfinished lift reopens paused; choose Resume work to continue. A completed stack returns to its result. Share its earned tier record from the result or the journal.

Paid once. Offline play. No ads or in-app purchases. This is a game, not professional crane training.
