Work the cable.
Tap the yard floor to set a trolley destination or drag the round pad for fine movement. Lower the cable near a numbered load and choose Hook load. Raise above obstacles before travelling.
Stack contracts
Open Contracts → Stack contracts. Place the supporting numbered load before its upper tier. Match the displayed center height, center the cargo and hold the cable steady until the strip fills for 1.25 seconds. Delivered cargo is solid: carry above it.
Pause and return
Opening an office/settings page stops the lift and releases touch controls. An unfinished lift reopens paused; choose Resume work to continue. A completed stack returns to its result. Choosing another job while a lift is unfinished asks whether to replace it. Keep this lift retains the suspended job.
Earned records
Completed stack jobs keep separate records and do not unlock career equipment. Choose Share earned placement after a finish, or tap its journal row, to open the iOS sharing sheet with a JSON record. It contains actual tier heights, supports, time and contacts.
Local data
Records and the live lift stay on this device; there is no account or cloud synchronization. Deleting the app can delete them.
Contact Gobling Company support. Include the device, iOS version, job name and steps; do not send passwords.